Most Enplug apps have a scheduling feature which allows you to control when your content is displayed.
Scheduling
To use scheduling:
- Log into Enplug.
- Click the Apps dropdown in the top menu.
- Select the desired app.
- Locate the content you'd like to schedule and click on the corresponding Display.
- Navigate to the Schedule tab.
Scheduling Options
Duration: This determines how long an image will stay on-screen every time it appears. This can be set up to 60 seconds using the slider or by manually entering a higher number. For best best performance, a duration of no less than nine seconds is advised.
Limit Days: This is used to display content only on certain days.
Limit Time: This is used to set specific time ranges for content to display. Multiple time ranges can be set by clicking the plus icon.
Schedule for Later: This is used to set a specific date for content to display. From the End dropdown, you'll be given the options of On Date, Never, and After content plays. Check the Delete when expired box to automatically remove content after the end date. This will take approximately 24 hours due to time zone differentials.
Priority Play: This is used to display only a specific app/content. When Priority Play is enabled for an app/content, no other app/content will display. If Priority Play has already been set for another app, this option won't be usable.
For questions or concerns, please reach out to our Support Team at support@spectrio.com.